STEP 1: PREPARE THE BASE
For patio and walkway applications: Roto-till portland cement into existing soil (94 lbs per 30 sq. ft.)
For driveway applications: Use 4-6" finely crushed stone on compacted soil
STEP 2: INSTALL EDGE RESTRAINT
Establish perimeters of project
Install pave stone edging using 12" spikes
STEP 3: SCREED SAND
Shovel pave stone sand or sharp, coarse, granular sand between two pieces of 1" (outside dimension) conduit pipes
Use 2x4 to screed and level sand
STEP 4: LAYING STONE
Create custom patters by combining various shapes and colors of stone
Start in a square corner and work out in a triangular direction
Lay each stone next to previously placed stone and slide it straight down
STEP 5: COMPACTION
Compact pave stones firmly into previously leveled sand
Fill joints by sweeping pave stone sand into gaps
Compact the surface one more pass to complete lockup
Source:http://www.bighornrocks.com
Previous Article: