Installation:
- put the cement and sand mixed mud on the floor (1:3), leave the space for stone thickness to be 5mm-10mm
- clean the paving surface, correctly put the control line of stone division on the paving surface
- averagely pave the cement and sand mixed mud + additive or stone agent to be 1cm high, and then put the artificial granite stone on it.
- after paving, the stone line between each other could be filled after 72 hours, so to enable the cement and sand mud under the stone could be dried. Use special cement to fill the line.